200 ft down, got to break the pump flanges every 50 ft and cable onto drums,every time we break a flange its like being in the shower with 50 ft of water coming out the side then reverse to fit the new one back in
thats a big fucking crane, bet that costs a pretty penny per day £1000 plus?
Thats about right for 'normal working' hrs but crimbo time is always £££'s more mate, dont want to look at the bill for when we go back tomorrow to finish off! 150 ton by the way